Computational complexity of the makespan of the three-stage flow-shop with some batch machines;
含有批处理机的三机流水作业加工总长问题的计算复杂性
In this paper, we investigate the computational complexity of the makespan of the three-stage flow-shop with some batch machines in some cases.
本文研究含有批处理机的三台机器流水作业加工总长问题在某些情形下的计算复杂性。
It is conjectured that the makespan of any dense schedule is at most 2-1/ m times the optimal makespan, where m is the number of machines.
其加工总长与最优值之比具有上界 2 - 1 /m(m为机器数 ) ,是一个尚未证明的猜想。
Copyright © 2020-2024 查校网 chaxiaow.com 版权所有 浙ICP备2024103067号
未经书面允许不得转载、复制信息内容、建立镜像!本网站内容仅供参考,请以各学校实际情况为主!内容侵权或错误投诉:1553292129@qq.com